Golder Associates perpared hydrogeology report for Tin One Mining JSC
An international company Golder Associates prepared a report on “Characteristics and preliminary geofiltrational model of hydrogeological conditions”.
An international company Golder Associates prepared a report on “Characteristics and preliminary geofiltrational model of hydrogeological conditions”.
CSA Global issued a final version of JORC-compliant Mineral Resource Estimate of Syrymbet Deposit.
Alex Stewart International Lab assayed 5,740 samples from Syrymbet Deposit.
Samruk-Kazyna Invest joined Tin One Mining JSC project in December 2013. The State Assets Managing Holding of the Republic of Kazakhstan owned and operated by the Government of Kazakhstan acquired a 12,61% stake of Tin One Mining JSC.
The Kazakhstan leading drilling company GRK Iskander drilled a total of 5,740 meters as part of Syrymbet mineral resources estimation program and processing test-work using Boart Longeyar drilling equipment.
One of the global leading engineering and design company AMEC was awarded a contract for the development of Pre-Feasibility Study of Syrymbet Deposit.